Gold Ore Dressing Production Line, Gold Mining Equipment made in China

1.High Capacity,Low Cost,, 2.High Recovery Rate, 3.High Concentrate Grade, 4.ISO9001:2000, CE approved - details see: https://www.machineto.com/gold-ore-dressing-production-line-gold-mining-equipment-made-in-china-10310588
Condition:NewType:sand makingApplication:ore dressing,granite,basalt,limestone,cobble,cement clinker,quartzite,iron ore etc.Motor Type:AC Motor
Capacity(t/h):50-1000t/hPlace of Origin:Henan China (Mainland)Brand Name:YUHONGModel Number:various
Certification:CE&ISO9001Warranty:one year expect wear partsAfter-sales Service Provided:Engineers available to service machinery overseascolor:Customized
material:Greateat steel in Chinaperformance:Stableafter-sale service:Installation,commissioningGuarantee:1year(wearing parts excluded)
1year(wearing parts excluded):The whole lifeprice:pricemini order:1 set 
Gold Ore Dressing Production Line, Gold Mining Equipment made in China
contact supplier for Gold Ore Dressing Production Line, Gold Mining Equipment made in China


Gold Ore Dressing Production Line:

Gold ore dressing production line are mainly made up of jaw crusher , ball mill , classifier , magnetic separator , flotation machine , thickener , dayer and so on . It can be matched with mine machine , elevator , conveyor to constitute complete ore dressing production line . It has the advantages as follows : high efficiency , energy saving , high throughput , economical and reasonable and so on .

Gold Ore Dressing Production Linw Flow :

raw gold ore -> crushing, screening -> conveying -> grinding and sizing -> flotation separation -> concentration (gravity separation or leaching and adsorption ) –> dryer –> fine gold ore.

1.Gold Ore Crushing , Screening and Conveying

Crushing and conveying system is used to in gold ore processing plant. Primary crushing, tertiary crushing equipment like jaw crusher, cone crusher, VSI crusher is used to break the larger rocks down to a size suitable for transport on the conveyor.

Rubber belt conveyor transports the crushed gold ore and waste rock approximately to the grinding mill and waste disposal area. Large electromagnets remove any steel debris excavated. Inclined vibrating screen is used to sizing the crushed gold ore.

2.Gold Ore Grinding and Sizing

Grinding and size classification to reduce the ore down to a fine particle size.

Gold ore is stockpiled at the grinding mill before being fed into a ball mill with lime, water and steel balls. The larger particles from this mill are returned to the ball mill for more grinding. The finer particles receive more grinding in the ball mill, and sizes are classified to give a final product of 80% <70 microns.

3.Gold Ore Concentration Plant for Beneficiation

Gold ore will be crushed to a coarse size before the ore is sent to the treatment plant via a

conveyor. At the treatment plant, ground gold slurry and lime is crushed further and ground finely

to slurry. The ore is initially processed by going through leaching and adsorption process in the

treatment plant.

For more information, Please to visit:http://www.s-crusher.com

Gold Ore Dressing Production Line, Gold Mining Equipment made in China
Packaging Detail:International standard package
Delivery Detail:45days

Related Product for Gold Ore Dressing Production Line, Gold Mining Equipment made in China