Gas Scrubber

Gas scrubber, - Based on customer's requirement, - Design Pressure1230 psig, - Wide range of size, dimension, - ASME - details see: https://www.machineto.com/gas-scrubber-10229343
Place of Origin:Shandong China (Mainland)Brand Name:HHModel Number:VS-das9856Liquid Flow Rate:Up to 859 T/H
Maximum Working Pressure:1220 psigCertification:CCC, CEStructure:SS Screen 
Gas Scrubber
contact supplier for Gas Scrubber


Gas Scrubber

These specifications cover the design and fabrication of multi-cyclotube
type vertical Scrubber to be supplied under these specification and to be
used for the removal of liquid and solid particles from the high pressure
natural gas stream. The Scrubbers will be installed at delivery point of
Gas Field and d/s 12" diameter transmission pipeline for custody
transfer/check metering station which are designed for operating
pressure of 800-1300 psig. The feed gas to the Scrubber shall be of
pipeline gas quality.
SPECIFICATION FOR CYCLOTUBES TYPE VERTICAL SCRUBBER
(A) 30-55 MMSCFD as specified in
the Schedule of Requirement.
(Annexure-IIA)
(B) 30 MMSCFD as specified in the
Schedule of Requirement.


PartComponentFunction
1Separatorto protect the steam make-up valve from wet steam
2Isolation Valveto isolate the installation from the steam supply
3Strainerto protect the control valve from detritus
4Self-acting Control Valveto regulate the steam flow to the heat exchanger
5Check Valveto prevent the ingress of air into the condensate system
6Temperature Controllerto sense and control the heater outlet water temperature
7 - 12 inc.Separator Steam Trap Set
13Air Ventto vent air from the condensate system
14Isolation Valveto isolate the heat exchanger from the flash vessel
15Strainerto protect the heater float trap from detritus
16Check Valveto prevent the pump steam supply trap from backflow
17Isolation Valveto isolate the steam trap set from the flash vessel
18Ball Float Steam Trapto drain the heat exchanger of condensate
19Sight Check Valveto prevent condensate backflow
20Flash Vesselto separate the flash steam and condensate from the heater
21 - 24 inc.Pump Steam Supply Steam Trap Set
25Isolation Valveto isolate the pump from the steam supply
26Check Valveto ensure directional flow through the pump
27Condensate Pumpto pump condensate from the receiver
28Check Valveto ensure directional flow through the pump
29Isolation Valveto isolate the pump from the condensate system
30Drain Valveto drain the pump and condensate riser for maintenance
Gas Scrubber
Packaging Detail:Non-package, iron or wooden pedestal, suitable for inland or marine transportation
Delivery Detail:20-30days after the contract come into valid

Related Product for Gas Scrubber