DONGFENG Brand Cummins engine 8*4 drive 12 wheels 12cbm capacity cement mixer truck
Condition:New | Place of Origin:Hubei China (Mainland) | Brand Name:Dongfeng-Aolong | Model Number:DFL5251GJBA4 |
Motor Power:275 kw | Mixing Power:140KW | Charging Capacity:12 | Reclaiming capacity:12 |
Speed of Mixing Drum:2R/M | Water Supply Mode:air injection supply water | Working Cycle Period:2h | Discharge Way:Rear downloading |
Outline Dimension:10200*2500*3910 | Hopper capacity:3-14cbm | Engine:Cummins engine and other brand | Painting:Can customize according to your requirement |
Motor and key parts:Mainly imported famious brands | Weight:130000 |
Name | CONCRETE MIXER TRUCK | ||||||||||
Model | DFL5251GJBA4 | ||||||||||
VEHICLE PARAMETERS | Overall Dimension (mm) | 9410/9200/10200*2500*3880/3910 | |||||||||
Total weight (kg) | 25000 | ||||||||||
Curb Weight ( kg) | 13000 | ||||||||||
CHASSIS CONFIGURATION AND PARAMETERS | Model | DFL5250GJBA/ DFL5251GJBA1 | Refit part configuration and parameters | Mixing drum | |||||||
Engine | Model | ISLe340 30 /L340-30 EURO III(Cummins Engine) | Ancillary frame | ||||||||
MAX OUTPUT | 250/276 | Hydraulic System | Decelerator | ARK.TOP.P68(Imported) | |||||||
DISPLACEMENT | 8900 | Motor | A2FM80, ARK.Messori .PV089R(Imported) | ||||||||
Gear Box | 8JS130T-B | Variable pump | A4VTG90,ARK.Messori. MF089 | ||||||||
Feeding and discharging devices | |||||||||||
Clutch | Φ430mm | ||||||||||
Control system | |||||||||||
Axle F/R | 7/13*2 | Electrical system | |||||||||
Water supply system | |||||||||||
Wheel Base mm | 3650+1350mm/3800+1350mm/4000+1350mm | Guard rail | |||||||||
Track Base mm | 1986 1860/1860 | Mixing cubage | 8-12m3 | ||||||||
Approach/Departure Angle | 25/13;25/12;25/17 | Obliquity of mixing drum | 11.5° | ||||||||
Tire | 11.00-20;11.00R20 | Cubage for Loading water | 11.17 m3 | ||||||||
Leaf Spring F/R | 8/12 | Filling Rate | 57.8% | ||||||||
Suspension F/R | 1460/2740;1500/2760;1500/3350 | Discharging Speed | ≥2 m3/min | ||||||||
Drive Form | 6*4 | Remainder Rate | <0.7% | ||||||||
Passenger Capacity | 2, 3 | Collapse Degree | 40~230 mm | ||||||||
FOB Shanghai port or DAF PINGXIANG GATE unit price(USD) | CIF unit price(USD) | ||||||||||
Notes | A.Delivery time: Normally with 15-25days after received your first deposit. B.Payment item: Normally 30% in advance and the balance should be paid before the shipment after your checking and confirmed. C.Guarantee time and services: from the vehicles safely arrived at destination and under proper operation situation, normally 12 months, but the whole life supply maintenance | ||||||||||
Exquisite manufacture, highly special-purposed and remarkable performance Original Dongfeng chassis, the performance is remarkable, stable and reliable. Tianlong cab is aesthetic and luxurious, and the riding is comfortable. Big cubage of the mixing drum allows for larger space for charging and mixing and avoids leaking the material in the uphill travel. The special high strength wear resisting alloy steel is adopted for the blade; the wear resisting ability is 2.5-3 times of 16Mn. It is formed through one time pressing. The mixing drum applies integrated automatic welding, effectively guaranteeing the welding quality; shot blast, rust prevention processing and baking varnish of the mixing drum effectively lengthen the service life. The mixing drum uses the special manufacturing technique to prevent vibration on tank body (guarantee its concentricity, even feeding and discharging, i.e. the remainder ratio is 0). The feed hopper and swinging discharge spout are added with the wear-resisting backing to lengthen the service life. The center of gravity is fairly low, enabling the whole vehicle to have a higher stability in driving. Original imported speed reducer and hydraulic motor guarantee that the vehicle has a steady running, and it is responsible for the user on each detail! |
Packaging Detail:Exorting package standard and suit for long distance trnsportation. |
Delivery Detail:Within 25 working days after received your advance paymement |