Carbonated Beverage Production Line/Processing Machine
Type:Filling Machine | Condition:New | Application:Food,Beverage | Packaging Type:Cans,Bottles |
Packaging Material:Plastic | Automatic Grade:Automatic | Driven Type:Electric | Voltage:380V/50HZ |
Power:5.4KW | Place of Origin:Jiangsu China (Mainland) | Brand Name:Renda | Model Number:DCGF 24-24-8 filling machine |
Dimension(L*W*H):2830*2030*2030MM | Weight:3800KG | Certification:CE,ISO | After-sales Service Provided:Engineers available to service machinery overseas |
Production Line:Carbonated Beverage Production Line/Processing Machine | main material:SUS.304/316 | Processing:Filling Machine | Processing Types:Carbonated Beverage,soft drinks |
filling machine model:DCGF24-24-8 filling machine | filling machine caacity:8000-10000B/H | filling vol:250-2000ml | filling bottle:PET/Glass |

Carbonated Beverage Production Line/Processing Machine DCGF Series filling machine Introduction: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Carbonated Beverage Production Line/Processing Machine | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Carbonated Beverage Processing Machine
Washing:
Filling:
Capping:
Carbonated Beverage Production Line/Processing Machine |
ZhangJiaGang Renda Packaging Machinery Co.,Ltdis a professionalManufacturer and supplier of Carbonated beverage production line in China. Meanwhile, we also provide water filling machine,Juice/Tea drink filling machine,Beer Filling machine,PET/Aluminium/Iron Can Filling machine,water treatment equipment, blow molding machine, Bottle Unscrambler ,shrink labeling/packing machineand so on.
Carbonated drink Filling Machinehas received ISO 9001:2000,CE certification.For more detailed information about our .Please feel free to contact us.
Remarks:
1. Price term: FOB SHANGHAI.
2. Payment term: 30% BY T/T or lc as deposit before production, the balance should be paid OFF before shipment.
3. If we don’t performance of the contract, we will pay for the 30%(need to discuss) of total amout as the penalty for you.
4. Delivery time: after contract 30 days and receive the payment.
5. WARRANTY: One year gurantee for machine AND MOULDs.
6. PRICE VALIDITY: AVAIBLE WITHIN 25 DAYS.
7. Installation: Our company takes responsibility for installation. Make sure the equipment work normally. It will take LESS THAN 3 weeks to install the machines and the installation time is decided by you after you get the machines.
8. Training: we can train the workers for you for free,and also train 2-3 engineers of you.
9. Testing: we testing the machine before shipment. after we install the machine,we will test it again to make sure it will work normally.
10. Payment for Our engineer: You need to pay 50(USD) one person one day to repair machine in your country.IF the time is 3 WEEKS, THAT WILL BE 1050 USD for one engineer to install the machine.
11. MOQ: 1set
12. Package: outside wooden packing

Packaging Detail:Carbonated Beverage Production Line/Processing Machine:wooden packing. |
Delivery Detail:Carbonated Beverage Production Line/Processing Machine:40 days |