API 16C choke manifold for sale
Place of Origin:Jiangsu China (Mainland) | Brand Name:Ruiyi | Model Number:manifold | Type:choke manifold |
Machine Type:Drilling Tool | Certification:API | Material:Stainless Steel | Processing Type:Forging & Casting |
Use:Well Drilling |
API 16C choke manifold
Assembly & structure
Choke manifold consists of choke valve, gate valve, pipeline, fittings and pressure gauge etc.
Working principle
When the pressure rising in well, fluid in well can be released in utilization of the choke valve opening/closing in choke manifold to control casing pressure, which can directly blow out through gate valve as the casing pressure is quite high.
Technical Specifications
Item Name | Choke Manifold | Kill Manifold | |||||
Model | JG/S2-35 | JG/SY-35 | JG/SY2-70 | JG/S2Y2-105 | YG-35 | YG-35 | YG-105 |
Main path and Side path( in mm) | 3 1/8×2 1/16(80×52) 4 1/16)×2 9/16(103×65) 4 1/16×3 1/16(103×78) | ||||||
Working Pressure(mpa) | 3000(21) 5000(35) | 3000(21) 10000(70) | 5000(35) | 10000(70) | 15000(105) | ||
Working Pressure°C(°F) | P.U -29~121 (-20~250) | ||||||
Working medium | Mud Gas(sulfur-hydrogen) | ||||||
Control type | Manual both-wings choke manifold | Hydraulic manual both-wings choke manifold | Hydraulic manual three-wings choke manifold | Hydraulic manual Four-wings choke manifold | Both-wings atmospheric valve |
More Products
Operation requirement
(1)All the working pressures of parts in choke manifold should be matched with the working pressure of the BOP stack used
(2)Choke manifold should be installed at the place where operator approach it conveniently, pressure test should be executed as installation, while the sealing test pressure should equal to the rated working pressure;
(3)Pipeline should be so smooth and straight as possible, the corner of the pipeline should be made of 120°shaped forged steel bent pipe, which should have adequately large bore.
(4)The working pressure gauge should be installed.
(5) In winter, the choke manifold be able to work under a low temp condition.