80t/h Asphalt Plant
Conform to CE;, Module design;, Environmental protection;, Downside hot mix storage silo;, World class control system. - details see: https://www.machineto.com/80t-h-asphalt-plant-10115443
Place of Origin:Beijing China (Mainland) | Brand Name:CA-LONG | Model Number:CL-1000 (80t/h) |
Our cold recycled system is similar to Ammann’s design----put recycled asphalt into mixer directly.
The cold recycled system includes:
a. cold bins, 2pcs;
b. belt conveyer, 1set;
c. transfer hopper, 1pc;
d. weighing system, 1set;
The capacity of cold recycled system is 30t/h, because it is not permitted to add too many recycled asphalt into the mixer, usually, it’s about 25%. So, capacity of the cold recycled system is 30t/h.
1. Cold aggregate feeding system | |
1.1 Cold aggregate bin | 4pcs |
1.2 Collecting belt conveyor | 4sets |
1.3 Horizontal belt conveyor | 1set |
1.4 Primary screen | 1set |
1.5 Inclined belt conveyor | 1set |
1.6Vacancy stop alarm device | 1set |
2. Drying drum heating system | |
2.1 Drying drum | 1set |
2.2 Main burner (with diesel oil) | 1set |
3. Main tower | |
3.1 Hot elevator | 1set |
3.2 Filler elevator | 1set |
3.3 Vibrating screen | 1set |
3.4 Hot bin | 1set |
3.5 Weighing system (aggregate, bitumen, filler) | 1pc |
3.6 Mixer | 1pc |
4. Hot mix storage silo (downside, 30t) | 1set |
5. Dust cleaning system | |
5.1 Primary dust cleaner | 1set |
5.2 Bag filter | 1set |
5.3 Pipeline system | 1set |
5.4exhauster | 1pc |
5.5 Chimney | 1pc |
6. Filler feeding system | |
6.1 Filler silo | 1pc |
6.2 Impeller conveyor | 1pc |
6.3 Screw conveyor | 1pc |
7. Pneumatic system | 1set |
8. Control system | |
8.1 Computer control systemand touch screen | 1set |
8.2Monitoring system | 1pc |
8.3 Power distribution cabinet, cables | 1set |
8.4 Control room (with air conditioner) | 1pc |
9. Bitumen heating and storage system | |
9.1 Bitumen tank (horizontal: 40t) | 1pc |
9.2 Bitumen transfer tank (underground) 10t | 1pc |
9.3 Bitumen pump | 2sets |
9.4 Hot oil boiler | 1set |
9.5 Small burner (fuel: diesel oil) | 1pc |
9.6 Hot oil pump | 2pcs |
9.7 Diesel tank (10t) | 1pc |
9.8 Pipelines | 1set |
10. Spare parts | 1set |
Packaging Detail:Transport by containers. |
Delivery Detail:40 days |