40cbm HMAP-ST500 Fix Bitumen Plant

1. Rational mobile structure, 2. Good environment control method, 3. Energy saving components, 4. Wear resisting parts - details see: https://www.machineto.com/40cbm-hmap-st500-fix-bitumen-plant-10115782
Condition:NewPlace of Origin:Liaoning China (Mainland)Brand Name:HMModel Number:HMAP-ST500
Voltage:380vPower(W):80kwDimension(L*W*H):12.5x2.2x2.5Weight:100tons
Certification:ISO9001;UCS;BVWarranty:12monthsAfter-sales Service Provided:Engineers available to service machinery overseasCAPACITY:40 ton per hour
Type:Stationary & Automatic BatchMixer Type:Twin Shaft Pug MillMixer Capacity:500kg/batchFiller Supply:Filler Silo 30 Tons & Filler Elevator
Operation:Computer & Manual dual controlAsphalt Heating:Hot Oil heatingOperator:Auto and Manual BothDust Collection Type:Bag Filter Dust Collector
Electrical Power:380V(Driving) & 220V(Control)/50Hz   
40cbm HMAP-ST500 Fix Bitumen Plant
contact supplier for 40cbm HMAP-ST500 Fix Bitumen Plant


MAIN EQUIPMENT COMPOSITION

1. Aggregate Supplying & Cold Bin:

--- Cold bin / Belt Feeder / #1STBelt Conveyor

2. Aggregate Heating Unit:

--- #2ndBelt Conveyor / Dryer / Burner / Blower / Hot Elevator

3. Main Frame:

--- Screen / Hot bin / Weighing Unit / Mixer / Asphalt Spray Pump

4. Dust collecting unit:

--- Dust Chamber / Exhaust Fan / Bag Filter / Chimney Dust Recycling Screw Conveyor / Air Compressor & Piping

5. Filler Supplying Unit:

--- Filler Silo / Screw Conveyor / Filler Elevator

6. Asphalt Tank:

--- AP Tank / AP Feeding Pump & Piping / Hot Oil Heater / Hot Oil Circulation Pump & Piping

7. Bunker-C/Diesel Tank / Heating Unit:

--- Bunker-C/Diesel Tank / Bunker-C & Diesel Piping.

8. Control System Operation Room:

--- Control Panel / Printer / C.C TV / Power Panel / Electric Wiring.

Since HM reserves the right to make refinements of update with or without prior notice, please feel free to contact us for the latest information you need.

URL: www.hemei-china.com

40cbm HMAP-ST500 Fix Bitumen Plant
Packaging Detail:Small parts in iron boxRail framework welded to facilitate liftingOutsourcing rope to prevent virtually scratch
Delivery Detail:60 DAYS

Related Product for 40cbm HMAP-ST500 Fix Bitumen Plant