2500t galvanized steel silo for grain with flat bottom silo
Condition:New | Capacity:500-100000 | Material:Steel,high strength galvanized steel | Place of Origin:Shandong China (Mainland) |
Brand Name:Boda | Model Number:TCK | Dimension(L*W*H):Actual situation | Weight:Actual situation |
Used for storage ofgrain, seeds, flour, feed, cement and chemistry.etc
The flat bottom storage silos withdiameter ranges from5.5m to 27.5mand the storage of single silocapacity can beup to 10,000 tonnes.Supply wholeconveyor, elevator, dryer,dust cleaning system.etc.You can tell us the equipments you may need and we can offer you the best quotation with high quality products.
Introduction of flat bottom steel silo’s structure:
1. Silo body : the silo wall sheets are corrugated that is made of high quality galvanizing board; the sheets are bolted together by common or high strengthen bolts .The thickness of silo wall is designed according to the strengthen theory ,which makes the whole wall can afford even swelling tension. The handle equipment can make it more convenient to maintenance and unloading , such as silo doors, interior and exterior ladder and protecting net.
2. Radial beam silo roof support system : the roof is made of galvanizing board that is 0.8mm thick, and bolts are with galvanizing die .There are special equipments on the silo roof such as natural vents, manhole, roof ladders and secure cages and so on .
3. The main parts of the silo bin and roof are made of galvanizing board or spares which can make silo become even more steady and durable with longer life time, which is good to realize automatic work.
Advantages:
1. Lower cost, just 35%-50% of the cement silo cost with lightweight than cement warehouse, which can remove it for re-use. And its life span can up to 30 years.
2. Easy and quick install with short construction period, assembly silo saving time cost.
3. Standardization. The assembly silo is equipped with relevant accessories, such as conveyor, ventilation and monitoring devices, etc. to ensure the supporting facility's smooth operate and maintain easier for its standarddization.
Some projects abroad:
Now feel free to contact me, whole silo project system will offered to you soon.
Packaging Detail:no packing,bulk |
Delivery Detail:From 1 month to 3 months |