20T Water cooling column for injection machine
Condition:New | Cooling Type:Cross Flow | Material:FRP | Place of Origin:Hebei China (Mainland) |
Brand Name:XIANGTE | Model Number:XT-T20 | Voltage:380 V | Power(W):0.75kw |
Dimension(L*W*H):1500*1500*1400mm | Weight:113kg,20T | Certification:CE | Warranty:1 YEAR |
After-sales Service Provided:Engineers available to service machinery overseas | NAME:Water Cooling Tower XT-T20 | High*Wide:200*145 MM | Motor Power:0.75 KW |
1. Water Cooling Tower
Technical Parameters of Water Cooling Tower | |||
Cooling Tower/Ton | High*Wide(cm) | Motor Power(kw) | Flow per hour/Ton |
5T | 128*85 | 0.18 | 5 |
6T | 140*95 | 0.18 | 6 |
8T | 160*95 | 0.18 | 8 |
10T | 165*95 | 0.25 | 10 |
12T | 170*100 | 0.25 | 12 |
15T | 182*110 | 0.37 | 15 |
20T | 190*128 | 0.75 | 20 |
25T | 200*145 | 0.75 | 25 |
30T | 205*150 | 0.75 | 30 |
40T | 215*165 | 1.1 | 40 |
50T | 230*190 | 1.5 | 50 |
60T | 250*225 | 2.2 | 60 |
70T | 253*225 | 2.2 | 70 |
80T | 268*250 | 3 | 80 |
100T | 282*290 | 3 | 100 |
125T | 313*330 | 4 | 125 |
1500T | 335*330 | 4 | 150 |
2.intro:
Cooling towers are heat removal devices used to transfer process waste heat to the atmosphere. Cooling towers may either use the evaporation of water to remove process heat and cool the working fluid to near the wet-bulb air temperature or in the case ofclosed circuit dry cooling towersrely solely on air to cool the working fluid to near the dry-bulb air temperature. Common applications include cooling the circulating water used in oil refineries, chemical plants, power stations and building cooling. The towers vary in size from small roof-top units to very large hyperboloid structures
(as in Image 1) that can be up to 200 metres tall and 100 metres in diameter, or rectangular structures
(as in Image 3) that can be over 40 metres tall and 80 metres long. Smaller towers are normally factory-built, while larger ones are constructed on site. They are often associated with nuclear power plants in popular culture, although cooling towers are constructed on many types of buildings.
Packaging Detail:Seaworthy packing/plastic woven bag,Depend on your detailed requirement |
Delivery Detail:25-30 days after received your advance payment |