2013 Nice quality hydraulic Guardrail pile driver

hydraulic Guardrail pile driver, 1. HS Code: 8430100000, 2. 100 sets per month, 3. China National Standard - details see: https://www.machineto.com/2013-nice-quality-hydraulic-guardrail-pile-driver-10113694
Condition:NewPlace of Origin:Henan China (Mainland)Brand Name:VictoryModel Number:FC-180
Weight:4tonDimension(L*W*H):4290/2000/2620 mmCertification:ISOName:screw pile driver
2013 Nice quality hydraulic Guardrail pile driver
contact supplier for 2013 Nice quality hydraulic Guardrail pile driver


2013 hot selling hydraulic Guardrail pile driver

1. Pile Driver and Extractor for Highway Guardrail Post is a new model for the installation and maintenance of highway anti-collision guardrails and highway guardrail post newly developed according to users' needs.

2. The functions of this machine are the same as NJJ series Guardrail Post Driver Truck. It adopts independent diesel engine as its driving force.

3. The towed moving speed is 50-80km/h. It integrates pile driving and pile extracting function, with 360 degree Rotating device. The equipment does not need to turn the direction during driving and pulling the guardrails on both sides.

4. The equipment can operate independently when separated with the chassis, can adjust the hydraulic driving directions.

5. It is equipped with brake device which is safe and reliable in operation. It is also used for the photovoltaic installation, solar cells and solar panels installation.

TypeFC-180
Size (L×W×H)4290×2000×2620 mm
G.W.2800 KG
Diesel Engine Power24 HP
Power of battery for electric start500 W
Displacement65 ml/r
Working Pressure16 Mpa
Rotation Angle360°
Radius of Gyration2100 mm
Pulling Stroke1600 mm
Lateral Stroke350 mm
Lateral Distance860 mm
Foot Supporting Stroke400 mm
Pulling Forcemore than 200 KN
Flow Rate of Hydraulic System50-65 L/min.
Impact Frequency11-18 Hz
Working Heightless than 3000mm
Moving Speed0-15 km/h
Towed Speed50-80km/h (safe and reliable)

2013 Nice quality hydraulic Guardrail pile driver
Packaging Detail:container
Delivery Detail:15days after receiving your payment

Related Product for 2013 Nice quality hydraulic Guardrail pile driver