2013 New closed circuit cooling water tower equipment

1 Evaporative coolers, etc., with more than 32 types and over 240 kinds of main specifications, 2 Widely used - details see: https://www.machineto.com/2013-new-closed-circuit-cooling-water-tower-equipment-10240778
Condition:NewCooling Type:Counter FlowMaterial:MetalPlace of Origin:Shandong China (Mainland)
Brand Name:KehuaModel Number:Closed circuit cooling towerVoltage:380-660Warranty:18months
After-sales Service Provided:Engineers available to service machinery overseas   
2013 New closed circuit cooling water tower equipment
contact supplier for 2013 New closed circuit cooling water tower equipment


2013 New closed Inner loop cooling water tower
Our main products are closed cooling towers, evaporative coolers, etc., with more than 32 types and over 240 kinds of main specifications. Our cooling products are widely used in steel work, casting, forging, quenching liquid (oil), hydraulic oils, vacuum furnaces, central air conditioning, ground-source heat pumps, air compressors, injection molding machines, engine blocks, glass melting kilns, boiler steam condensate cooling, power plants, chemical engineering, petroleum and beer, beverage, food, cold storage and industrial refrigeration equipment and so on.

Advantages:

Characteristic

Working principle and structure component diagram

Water or other liquid is circuit in the coil of closed cooling tower , fluid heat is coil of the tube wall absorption, through the wall in the fan of coping of the heat discharge outside when the fluid temperature higher (more than set temperature) automatic startup spray system, spray water in sticky wall formation water film endothermic evaporation into steam, air flowing away, to be evaporation of water droplets falling on header tank in circulating cooling use coil in the liquid (softened water or other liquid) closed circulation and consumption minimum, spray water consumption also only for the unit flow of 1-2%

2013 New closed circuit cooling water tower equipment
Packaging Detail:it depends
Delivery Detail:Within 15-20 days after receive the down payment

Related Product for 2013 New closed circuit cooling water tower equipment