2013 environmental products with CE ISO & BV manufacturer of tire pyrolysis plant
Condition:New | Type:Tire Machine | Tire Machine Type:Tire Recycling Machine | Place of Origin:Henan China (Mainland) |
Brand Name:TL | Model Number:TL-2866 | Voltage:220V/380V | Power(W):18KW-22KW |
Dimension(L*W*H):d2800*l6600*16mm (thickness) | Weight:37Tons | Certification:CE &ISO | Warranty:2 years free |
After-sales Service Provided:Engineers available to service machinery overseas | Steel:Q245R &Q235 | pressure:Normal pressure | temperature:380-400 degree Max |
noise:<85dB | security valve:3 pieces | alarm system:pressure release automatically | workers needed:3 or 4 |
cooling methods:water cooling | land covered:300 square meteres | delivery time:15days |
The tyre & plastic pyrolysis machine details
About our company
We are specialized in manufacturing waste tire, plastic & rubber pyrolysis machine, oil distillaiton equipement, incidental tyre cut machine, carbon black refining machine and carbon black grnulator machine according to the market and customer requirements. With advancedproduction technology, high quality products, excellent sales and good afeter sale service, our products are sold both in domestic and international market.
The model and capacity:
Fuel
The fuel can be fuel oil, heavy oil, coal& firewood.
The processing time:
Model | capacity | Feeding | Processing | Cooling | Discharge | total |
2200*6000 | 5ton | 2hr | 7-8hr | 2hr | 2hr | 14hr |
2200*6600 | 6ton | 2hr | 8hr | 2hr | 2hr | 14hr |
2600*6000 | 8ton | 3 hr | 10 hr | 3 hr | 3 hr | 19 hr |
2600*6600 | 9ton | 3 hr | 11 hr | 3 hr | 3 hr | 20 hr |
2800*6000 | 10ton | 3 hr | 12 hr | 3 hr | 3 hr | 21 hr |
2800*6600 | 12ton | 3 hr | 13-14 hr | 3 hr | 3 hr | 23 hr |
End product percentage (the raw material is tyre)
Machine motor Power
Packing Containers:
2200*6000 | two 40HQ containers |
2200*6600 | |
2600*6000 | one 40FR open container and one 40HQ container |
2600*6600 | |
2800*6000 | |
2800*6600 |
The machine installation
We will give the foundation drawings to buyer after make the order .we will send engineer when buyers gets the machine. The engineer mainly installs the machine and trins your workers.
The machine covers area:
The machine itself cover 300 square meters (length 20M, Width 15M).
Add raw material stay, carbon black stay, big oil tank zone, workers rest room and simple office. It takes at least 600-800 square meters.
Workers need to operate machine:
Three or four workers are enough for one set machine.
Delivery time:
We will delivery the machine within 15-days after getting the advance payment(30% of total amount by T/T).
Port of China
Lianyungang port or Qingdao port
Working process
Firstly, two or three workers put the raw material into the furnace, seal the feed inlet, and then burn the coal or wood in the bottom of the furnace. The waste raw materials in thereactor will be heated slowly. The oil steam will be produced when the temperature reach 180°C-400°C. And then the oil steam will be separate to light component and heavy component by separate device. The light component will enter into the condenser and meanwhile the residues will be discharged automatically in succession. After cooling, the liquefied part will be crude oil, and the waste gas (this part can not be liquefied) will return to heating supply system to be burned by combustion gas purification system.
The analysis of economic benefit
The warranty and after-service
1) We will supply the foundation drawings to buyer after get deposit.
2) The delivery time is 15-20 days after get deposit.
3) We will send engineers to install the machine when the machine reach buyer's factory.
4) We warranty the complete machine two years, we will maintenance all it life. When the machine can not running normal, the buyer can call us, we will help buyer repair it by call, if can not solve, we will send engineer to buyer's factory at the shortest time. If buyers need change parts, you can buy it from our factory.
At last, we are looking forward to good cooperation with you!
Packaging Detail:1*40FR and 1*40HQ |
Delivery Detail:15-20days after deposit |