2 (Two) Steel Rollers(bowls) Calendar/calender/calendaring/calendering Machine

This machine mainly applies to process rolling the material with high hardness or high strength.Such as metal mesh industries. - details see: https://www.machineto.com/2-two-steel-rollers-bowls-calendar-calender-calendaring-calendering-machine-10276630
Place of Origin:Jiangsu China (Mainland)Brand Name:BroadenwinModel Number:1800mm 2000mm 2600mm 2800mm 3200mm 3600mm 4200mm 4800mmMachine Type:press machine
Product:OtherMaterial Capabilities:metalCertification:ISO9001color:smoky grey
2 (Two) Steel Rollers(bowls) Calendar/calender/calendaring/calendering Machine
contact supplier for 2 (Two) Steel Rollers(bowls) Calendar/calender/calendaring/calendering Machine


Main technical parameters

Serial NO.ItemContents
1PatternVertical two rollers. The both of two rollers are all with heating; or the both of two rollers are all without heating.
2Norminal Breadth1400\1600\1800\2000\2200\2400\2600\2800\3000\3200\3400\3600\3800\4000\4800
3Running speed0-20 meters per minute
4Max pressure between rollers40T\60T\80T\100T
5Running temperature of mirror roller≤220°C

Factory Overlook

Certificates

Workshop

Enterprise Management

Service Process

A. To introduce the characteristics of products, slove the questions raised by customers in brief and record the special requirements of customers.

B. To supply several solution to customers for reference according to the requirements of customers and offer prices depending on different solution.

C. To decde the final scheme and sign the contract.

D. According to the final Scheme, organize the operation and offer customers the installation drawing. Send the engineer to prospect on spot, if necessary.

E. After the equipment arrives on site, our engineer shall provide a free instruction in erection on site, debugging after installation and technical training.

F. After we received the telephone from customers, we will try our best to instruct customers to solve the problem; if customers really cannot knock over the engineers shall arrive on site a minute earlier as soon as possible and prevent from fear of disturbance in the rear:

In China a. Within 500 kilometers, the engineer arrives within 24 hours at the latest;

b. Within 1000 kilometers, the engineer arrives within 48 hours at the latest;

c. Beyond 1000 kilometers, the engineer arrives within 72 hours at the latest;

G. Within the year when the equipment is brought into operation, our after-sales engineers shall repay visits customers at irregular intervals and give suitable suggestions to customers for reference, according to the actual use. Meanwhile, we will ask customers for suggestions for improvement, so that we will make long-term progress in technology.

2 (Two) Steel Rollers(bowls) Calendar/calender/calendaring/calendering Machine
Packaging Detail:SEA_WORTHY WOODEN CASE
Delivery Detail:70 days after the commencement of the order

Related Product for 2 (Two) Steel Rollers(bowls) Calendar/calender/calendaring/calendering Machine